Assmang Dwarsrivier

About This Project

  • Plant Audit and Recommendations
  • Loadout Station Control System Upgrade Engineering
  • Loadout Station Control System Upgrade Installation
  • Control System Upgrade – Plant
  • Control System Upgrade – Underground
  • Clarifier Upgrade
  • Ventilation Fans MCC 3
  • Ventilation Fans MCC 2
  • Fire Control Interface
  • Plant Sump Level Control and Instrumentation Supply
  • MCC 3 Rebuild
  • Pumpstation Telemetry System
  • (13) Strike 11 Extention
  • (12) Strike 10 Extention
  • Decline 3 Extention
  • North Shaft – MCC 2 Manufacturing, Supply & Manufacturing, Supply & Engineering
  • North Shaft – MCC 1 Manufacturing, Supply & Manufacturing, Supply & Engineering
  • North Shaft – MCC 1 & 2 Decline Conveyor 1,2 and Strike 1 Commissioning
  • Design Supply & Comm of Telemetry Panel Dam 26
  • Design Supply & Comm of the Upper Return Dam Telemetry Panel
  • Manufacture, Supply of Equipment & Eng of Remote I/O Panel for MCC 1 & 2 North Shaft
  • Fire Detection and Suppression Solution
  • NFPA Upgrade – Fire Detecion and Suppression Solution Upgrading Old System
  • Strike 3 Extension Pull Key Supply and Installation, Engineering and Commissioning
  • South Shaft Vent Fans 2 Installation and Commissioning
  • Strike 14 Engineering and Commissioning, Supply and Installation
  • Repairs old Pipe System
  • Above Ground Fire Suppression Installation ( Training System)
  • Above Ground Fire Detection Installation Training System
  • Above Ground Fire Suppression Installation Workshop (MCC)
  • TRP Tailings Plant Upgrade
  • North Shaft Decline Conveyor EC & I Engineering and Design
  • TRP Tailings Pump Station Value Installation
  • Dam 26 Automation of Instrumentation Signals & Pump Drive
  • MCC 03 Starter Modifications
  • Water Study Site Audit and Design
  • Lighting Transformer Feeder & Distribution Board
  • Vibrating Feeder PID Control
  • New Plant Substation – MCC Nr. 4 200 KT Upgrade
  • Water Treatment Plant, Fresh Water Pumps & Water Balancing
  • Underground MCC 02, Remote I/O Commissioning & SCADA Development
  • Conveyor Takeup Guard Protection Device Commissioning
  • Engineering Design of Conveyor Take-up Guard Protection
  • Conveyor Condition Monitoring Audit, Detail Report
  • North Shaft MCC ELT-BMS Modification System
  • CCTV Camera Audit, Detail Report, Preliminary Design Report, Preliminary Design
  • MET Grade Stockpile Expansion Project
  • Condition Monitoring Design Engineering
  • Safety Device Monitoring & Reportin
  • Network Upgrade Investigation
  • Magnetic Chrome Separation Plant E & I and C Installation
  • MCC 4 & 5 VSD Commissioning
  • Generator Quality Control
  • Low Grade Stockpile Upgrade Project
  • Medium & Low Voltage Electrical Audit Phase – Special Studies