Assmang, Khumani

About This Project

  • Electrical, Instrumentation and control system engineering
  • Control System Supply – Design, Engineering & Configuration of Sample Tower
  • Design,Eng, Control System Design Cold & Hot Commissioning of the Sub-System
  • E&I and Control Installation on the Capstan Brake
  • Water Pump Station – OHL & Ancillary design for water pump station / Bruce Mine
  • Development of the Khumani Operator Training Simulator
  • Load – Out Back-Up Generators
  • Solar Pilot Project
  • Quality Control – COC
  • PLC Test Panel
  • Sedibeng Pump Station
  • Engineering for CV20 Upgrade
  • Engineering for CV75 Upgrade
  • Instrumentation Design & Software Development for the New Static Scale building at Loudout
  • OFF – Grade#2 Project / SCADA & Systems Engineering
  • Drive Supply & Installation and All Ancilliaries
  • Electrical Supply Design&Control, Instr Conveyor Fire Protection System
  • Operator Training Simulator Update
  • WHIMS Optimisation Projects
  • WHIMS Feed Prep Pumps 90KW VSD Drive Upgrade
  • E- Library CD’s from Archive Systems and CD’s in Engineering Building
  • Jigs PLC Panel Upgrade
  • RE-Engineering & Design of The PLC and Related RIO Panels for the off grade Reclaimer
  • Lumpy Jig 1,2 & Fines Jig 3 Upgrade and JIGS 3 & 4
  • Stratus Server Replacement
  • Crusher Panel View Upgrade
  • Thickener Power split & PLC Design
  • ThinManager Software Installation & Software Upgrade
  • FDES Database Installation
  • LDV Workshop Engineering
  • Category
    Projects