Assmang, Beeshoek Mine

About This Project

  • Mid South plant electrical, instrumentation, and control system design and plant simulation.
  • Contaminated ore plant electrical, instrumentation, and control system design and plant simulation.
  • Sampling plant, instrumentation, and control system design and plant simulation.
  • Data historian design and implementation.
  • Expert system development for thickener control.
  • Metering & Power Factor Correction Engineering Cost
  • Power Factor & Metering Investigation & Preliminary Design
  • Bateman – Discard Spreader – Engineering
  • MCC and Telemetry for Borehole Pump
  • Outstation Telemetry Upgrade / Phase 1
  • Outstation Telemetry Upgrade / Phase 2
  • SCADA Integration of the two new Geoscan devices into the existing
  • Beeshoek – PFC Modifications
  • Beeshoek – Network Upgrade
  • Geoscan VSD Conveyor Installation
  • PLC Upgrade to Unity 7
  • Commissioning of Network Upgrade
  • South Mine Panel Replacement
  • Beeshoek – Secondary Crusher PLC Upgrade Project
  • Beeshoek – Jigs PLC Panel Upgrade
  • PLC Panel Upgrade Project Mid South LP-003
  • South Mine Panel Replacement – Installation of the 6 panel Unigear Switchgear
  • PLC Panel Upgrade Project Mid-south LP-002
  • Mid South MCC 1 – Eng & Manufacturing Upgrade Project
  • Fines Load out MCC
  • Mid South MCC Software & Firmware Upgrade
  • PLC Panel Upgrade Project Mid-South LD-001
  • Control System Audit
  • Remote I/O Panel Supply, Installation & Commissioning
  • Fire Monitoring from SCADA
  • 32Y Primary Crusher Switchgear Upgrade
  • MidSouth MCC 3 Upgrade
  • Electrical, Instrumentation & Control System Audit
  • Tommy’s Field – Outstation RIO Panel
  • HF Pit Outstation RIO Panel
  • Server Room Design & Upgrade
  • Medium Voltage Reticulation Diagram Update E-TAP Modelling
  • MCC 3 Control System
  • Network Installation and UPS Upgrade
  • MID South MCC 1 I/O Replacement
  • JIG Plant Feed Automation
  • Outstation Panels Ethernet Radio Upgrade
  • Plant P&ID Upgrade
  • MCC 3 RIO Rack Upgrade
  • PLC & SCADA Software Improvements
  • MID South MCC 4 Engineering Y Manufacuring Upgrade
  • MID South MCC 5 Engineering & Manufacturing Upgrade
  • MID South MCC 2 Engineering & Manufacturing Upgrade
  • Category
    Projects